Pinole's Appian Village Development

Appian Village Development

PROJECT DESCRIPTION

The project consists of the demolition of the existing vacant Doctors Medical Center Pinole Campus buildings and all associated improvements and the development of 26 new three-story residential buildings containing 154 units, as well as associated site improvements on the 7.38-acre site.

PROJECT DETAILS
Address/APN   Assessor Parcel Number   Land Use and Zoning Designation  Project Number
2151 Appian Way 401-240-017 and 401-240-018 General Plan: Service Sub-Area
Specific Plan: Service Sub-Area in the Appian Way Corridor
Zoning: Residential Mixed Use (RMU) and Commercial Mixed Use (CMU)
 PL21-0016
APPROVAL HISTORY

On April 11 the Pinole Planning Commission unanimously approved entitlements for the development “Appian Village” at 2151 Appian Way. The proposal is to demolish all existing structures, parking areas and infrastructure at the former Doctor’s Medical Center site and construct 154 units of for-sale housing in 26 buildings. The units would be offered in stacked flat (where each unit is above/below each other) and townhome (where each unit is side by side) configurations with square footages ranging from 1,400 – 1,800 square feet. The applicant will be installing all new infrastructure (water, sewer, storm drainage, and streets) as well as all new curb, gutter, sidewalks, landscaping, paseos (pedestrian pathways), turf areas and a children’s outdoor/play area. The project will provide 31 of the 154 for-sale units as affordable units to moderate and low-income households. 

CONSTRUCTION TIMELINE

It is anticipated that construction will begin in Spring of 2023 and continue for a duration of 3 years.  Demolition of the old buildings is expected in the Summer of 2022, land development will begin as soon thereafter as possible and is anticipated to take half a year.  Home construction will begin in Summer 2023.  Home sales are projected to commence in the Fall of 2023.  Homes nearest Canyon Drive are expected to be constructed first.  Any questions can be directed to the developer’s Project Manager Kerri Watt  ([email protected]). 

POINTS OF CONTACT
Pinole City Staff:   Applicant:  
David Hanham
Planning Manager
2131 Pear Street
Pinole, CA 94564
510-724-9842
[email protected] 
Kerri Watt
DeNova Homes, Inc.
1500 Willow Pass Ct.
Concord, CA 94520
925-852-0541
[email protected]

Site LocationSite LayoutDesign - Facades